Site breakdown
Installation of bored and basement foundations
Installation of the internal drainage system, production and household sewerage with the output from the greenhouse up to 3 m
Installation of the system of technological drainage with a system of reuse of drainage drains
Installation of drainage disinfection system
Installation of drainage filtration system
Concreting ditches around the greenhouse in the width of 0.8 m
Concreting and polishing of tracks in a 3.5 m wide greenhouse.
Mounting of the steel part of the frame of the greenhouse
Installation of ventilation system
Installation of aluminum profiles with a tent and side glass guard
Installation of the system of horizontal energy stinging
Installation of air recirculation system
Installation of evaporative cooling and air humidification (SVOP).
Vertical layout of the ground cover in greenhouses with backfilling of the latter with sand 10-15cm thick and tamping
Installation of the drip irrigation system (including a set of water storage tanks and solution units)
Installation of the automated microclimate control system
Installation of plant nutrition system СО2
Installation of trays for technological cultivation of plants
Installation of emergency lighting in a greenhouse
Vertical layout
Assembling trellis
Installation of main pipelines from the boiler house to the heat distribution "comb" in the greenhouse.
Installation of the heating system and heat distribution "combs" in the greenhouse (without installing the insulating coating "combs" and painting the pipes).
Mounting the foundation under the buffer battery
Mounting of the buffer tank 1000m3
Installation of foundations under the boiler house, for boilers + concreting of the floor in the boiler room (including the manufacture of armored frameworks)
Installation of boiler equipment and main pipelines from the boiler room (the output of heating mains from the boiler house).